Steel Fixing Method Statement Template is a complete and comprehensive document that outlines all the on-site procedures, main hazards, risks and controls associated with guidance on steel fixing including setting and tying steel reinforcing bar for construction.

The Steel Fixing Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure